2013 Stiles Road

2013 Stiles Road Reconstruction

General Info

Lead department: Engineering Department
Project manager: Robert Puff, Engineering Director
Funding: Tax Rate

Project Details

The Town of Salem completed the reconstruction of Stiles Road during the 2013 construction season. The reconstructed road consisted of a reclaimed stabilized base, new pavement, and complete drainage system upgrades. The project extends the full length of Stiles Road from Route 38 to Pelham Road.