2013 Pond Street Culvert

Pond Street Box Culvert Replacement

General Information

Lead department: Engineering Department
Project manager: James Danis, Engineer
Funding: Tax Rate

Project Details

The Town of Salem completed reconstruction of an existing stone box culvert on Pond Street during the 2013 Pond Street roadway reconstruction project. The existing stone box culvert was replaced with a precast box culvert and associated wing walls. The new concrete structure was faced with the original stone in order to maintain the character of the surrounding area. The culvert is located just east of Copper Beech Road.